We address the dynamic m identical parallel machines scheduling problem.
Sequence dependent setup operations are performed by a single server.
Complete rescheduling approaches are proposed and adapted into the simulation model.
An event driven based rescheduling strategy is developed to control the dynamic system.
The objective is to minimize the length of schedule.