Some issues of industrial scale boron isotopes separation by the laser assisted retarded condensation (SILARC) method
详细信息    查看全文
文摘
Industrial facility should has a modular structure. Physical constraints on setup geometry were studied. To cut energy expenses each irradiation cell should be designed as a resonator. Criterion to find optimal setup geometry and operational policy was introduced. Proposed method can provide three times less energy expenses.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700