Recent progress of China HCCB TBM tritium system
详细信息    查看全文
文摘

Comparing with our previous design, improvements have been made according to the up-to-date experiments and simulations: (1) The palladium alloy tube in the previous design is now removed in the upgraded one and the cryogenic molecular sieve bed is replaced by the getter bed to reduce tritium inventory; (2) Hot metal reduction bed is relocated from T-Plant to Port Cell; (3) TAS is now integrated into TES.

The proposed coolant purification is based on catalytic oxidation and molecular sieve bed adsorption for tritium removal, as well as hot metal adsorption for the elimination of non-tritium gaseous impurities. Some operation parameters and functional components are improved. The interface with the high pressure HCS and other plant systems was incorporated taking into account of the requirement from the ITER port management group meetings.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700