Online scheduling in a parallel batch processing system to minimize makespan using restarts
详细信息    查看全文
文摘
We consider an online scheduling problem in a parallel batch processing system with jobs in a batch being allowed to restart. Online means that jobs arrive over time, and all jobs’ characteristics are unknown before their arrival times. A parallel batch processing machine can handle up to several jobs simultaneously. All jobs in a batch start and complete at the same time. The processing time of a batch is equal to the longest processing time of jobs in the batch. We are allowed to restart a batch, that is, a running batch may be interrupted, losing all the work done on it. Jobs in the interrupted batch are released and become independently unscheduled jobs. We deal with an unbounded model where each batch’s capacity is sufficiently large. We provide a linear online algorithm with competitive ratio 3/2 for the problem. We also show that the considered problem has no online algorithm using restarts with competitive ratio less than .

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700