System dynamics model of tritium fuel cycle was developed for analyzing stock and flow of tritium in fusion power plants.
Sensitivity of tritium build-up to breeding ratio parameters has been assessed to two plant concepts having 3 GW and 1.5 GW fusion power.
D-D start-up absolutely without initial loading of tritium is possible for both of the 3 GW and 1.5 GW fusion power plant concepts.
Excess stock of tritium is generated by the steady state operation with the value of tritium breeding ratio over unity.