We tested interruptions from information systems during manual assembly task.
We used an existing interruption coordination framework.
The experiment was performed in a simulated factory using typical assembly task.
Negative effects on errors and time to assemble were smaller than in existing work.
Smart interruption systems were shown to introduce an unexpected complication.