Full scale performance of the aerobic granular sludge process for sewage treatment
详细信息    查看全文
文摘

A robust and stable granule bed of more than 8 g L−1 was formed and maintained with an SVI5 of 45 mL g−1.

The energy usage was 13.9 kWh (PE150, removed year)−1.

The volume needed for the AGS plant was 33% lower than the existing CAS plant.

Maximum volumetric conversion rates for N and P were 0.17 and 0.24 kg (m3 d)−1 respectively.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700