Medium-term maintenance turnaround planning under uncertainty for integrated chemical sites
详细信息    查看全文
文摘

We consider the critical element of uncertainty in turnaround planning.

Production decisions are treated through stochastic programming ideas.

Manpower aspects are handled through a robust optimization framework.

Through an industrial case study, we demonstrate the potential for significant savings through our formulations.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700