Projections are time series that describe how a variable might evolve over time. We describe an expert elicitation protocol for assessing uncertainty around projections. The resulting probabilistic projections can be passed to e3 models to produce probabilistic projections of model outputs. The protocol is illustrated with two real-world case studies. An R package projections for assisting with the elicitation protocol is provided.