Inventory sharing in integrated network design and inventory optimization with low-demand parts
详细信息    查看全文
文摘
Service Parts Logistics (SPL) problems induce strong interaction between network design and inventory stocking due to high costs and low demands of parts and response time based service requirements. These pressures motivate the inventory sharing practice among stocking facilities. We incorporate inventory sharing effects within a simplified version of the integrated SPL problem, capturing the sharing fill rates in 2-facility inventory sharing pools. The problem decides which facilities in which pools should be stocked and how the demand should be allocated to stocked facilities, given full inventory sharing between the facilities within each pool so as to minimize the total facility, inventory and transportation costs subject to a time-based service level constraint. Our analysis for the single pool problem leads us to model this otherwise non-linear integer optimization problem as a modified version of the binary knapsack problem. Our numerical results show that a greedy heuristic for a network of 100 facilities is on average within 0.12 % of the optimal solution. Furthermore, we observe that a greater degree of sharing occurs when a large amount of customer demands are located in the area overlapping the time windows of both facilities in 2-facility pools.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700