Optimal generation rescheduling for meshed AC/HIS grids with multi-terminal voltage source converter high voltage direct current and battery energy storage system
We present optimal scheduling solution based droop control for meshed AC/HIS grids. We consider the HIS station limits and charging/discharging strategy. We also use actual 24 h demand profile to implement optimal rescheduling. The parallel processing is used to find optimal solutions of meshed AC/HIS grids. The simulation results confirm the effectiveness and validity of proposed approach.