Site utility system optimization with operation adjustment under uncertainty
详细信息    查看全文
文摘
Uncertainties are classified into time-based and probability-based uncertain factors. Multi-period operation and recourses deal with uncertainty implementation. Operation scheduling are specified at the design stage to deal with uncertainties. Steam mains superheating affects steam distribution and power generation in the system.