Bridging the gap: Understanding the economic impact of ore sorting on a mineral processing circuit
详细信息    查看全文
文摘

Installing ore sorters in the pebble circuit of a SAG mill is a logical first step.

Ore sorters in a SAG circuit show payback terms of less than 24 months.

Sorting technology can be cost effective even at relatively small scales.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700