A Quality assurance model in construction based on geodetic surveying techniques was developed. The interaction of construction and geodetic processes is modeled in various level of detail using high-level Petri nets. Different scenarios including disturbances and delays are shown. Simulation shows, that the construction process is robust concerning small impacts. An integration of disturbances and delays can induce a fail of planned week cycle.