Reliability-based probabilistic optimal joint placement of PMUs and flow measurements
详细信息    查看全文
文摘

Contingencies are screened by MCS to obtain a more cost-effective solution.

PMUs and FMs are located at more reliable locations for a more reliable solution.

Cost of PMUs and FMs are explicitly modeled as the objective function.

FMs are modeled in OPP using a linear rather than nonlinear constraint.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700