The CMS Preshower construction and commissioning
详细信息    查看全文
文摘
The main physics goal of the CMS Preshower detector is to provide good γ–π0 separation in the endcap regions. The Preshower detector, comprising nearly 4300 silicon strip sensors, was assembled and commissioned in 2008 before being installed in CMS in Spring 2009. The detector check-out shows 99.9 % of channels operational with good noise performance.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700