Biohydrogen production from waste bread was techno-economically assessed.
Aspen Plus was used to simulate the mass and energy balance of the plant.
The unit hydrogen production cost was USD1.34/m3 H2 (or USD14.89/kg H2).
The plant started to profit with the waste bread fed more than 0.58 ton/day.