Joint Use of Hydrological Modeling and Large-scale Stochastic Optimization Techniques Applied to the Nordic Power System
详细信息    查看全文
文摘
The Nordic power market is a hydro-dominated one, having in a normal hydrological year about 50% of its power production from hydropower. The hydro scheduling optimization that is being done by the large hydro producers in Norway and Sweden has strong impact on power prices in the Nordic area. Hence, methodologies that can better predict future inflow levels and power prices are of great value to traders, risk managers and others that are taking positions based on expectations of current and future hydro supply. The objective of this paper is to (i) present a modeling approach for forecasting power prices in hydro-based power systems and corresponding uncertainty levels that are caused by hydrological uncertainty, and (ii) to benchmark the forecasting modeling system towards market data for the period 2010-1015. The hydrological models are built on the well-known principles of the hydrological HBV model. We have developed HBV models for the Scandinavia area, dividing the catchments into 23 homogenous hydrological regions. Using precipitation and temperature actual and forecasts for a large number of meteorological stations, we simulate for net precipitation (precipitation minus evapotranspiration), inflow, snow, soil- and ground water and hydrological temperature, measured in energy units. The fundamental power market model (SDDP) uses these data to simulate market-clearing prices assuming profit-maximizing producers. The benchmark analysis shows that the market price forecasts generally have a good accuracy and on average has higher predictive power than the financial market when it comes to forecasting the actual, delivered prices for front week and front month power futures.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700