Estimation of 41Ar activity concentration and release rate from the BAEC TRIGA research reactor (BTRR) is performed.
The estimation is done theoretically in the case of normal reactor operation condition by several governing equations.
The estimated activity and release rate is found within the safety limit as mentioned in the BTRR safety analysis report.
Results show that the reactor hall area meets the regulatory limits for 41Ar concentrations.