A new bi-objective redundancy and maintenance optimization model is developed.
The trade-off between wind farm configuration and the maintenance strategy is investigated.
A new imperfect block opportunistic maintenance strategy is developed.
A three-phase discrete event simulation is used to evaluate the performance measures.
The comparative analysis addresses the capability of the proposed model.