This article proposed a parameter (CP) to quantitatively evaluate the efficiency of water injection in heavy oil sand reservoirs A group of threshold CPs were established based on the previously completed stimulation projects on a variety of oil sand reservoirs A criterion was established to predict the time when hydraulic communication is accomplished between the dual SAGD wells