Incorporation of renewable energy sources into grid is a challenging problem due to their intermittent nature.
This paper solves an optimal scheduling problem considering the hybrid generation system.
A new strategy is proposed taking into account the impact of uncertainties in wind, solar PV and load forecasts.
Simulations are performed on IEEE 30 and 300 bus systems with Genetic Algorithm and Two-Point Estimate Method.