Efficient heuristics for the parallel blocking flow shop scheduling problem
详细信息    查看全文
文摘
New Constructive heuristic for both the PBFSP and the DBFSP. Combination of IGA and ILS methods with two types of VNS. A MILP model solved for small-sized instances. The proposed methods are very effective.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700