Production and setup policy optimization for hybrid manufacturing-remanufacturing systems
详细信息    查看全文
文摘
One part-type hybrid manufacturing–remanufacturing facility with setup. Production and setup policy optimization in a stochastic dynamic environment. Coordinated policy for setup, manufacturing and remanufacturing activities. Analytical computation of the optimal cyclic production schedule. Convergence of perturbed trajectories to the limit cycles.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700