Upgrading activated sludge systems and reduction in excess sludge
详细信息    查看全文
文摘
Most of 200 Activated Sludge Plant in Iran are overloaded and as a result, their efficiency is low. In this work, a pilot plant is manufactured and put into operation in one of the wastewater treatment plants in the west of Tehran. Instead of conventional activated sludge, a membrane bioreactor and an upflow anaerobic sludge blanket reactor used as a pretreatment unit in this pilot. For the sake of data accuracy and precision, an enriched municipal wastewater was opted as an influent to the pilot. Based on the attained result, the optimum retention time in this system was 4 h, and the overall COD removal efficiency was 98 % . As a whole, the application of this retrofit would increase the plant¡¯s capacity by a factor of 5 and reducing the excess sludge by a factor of 10. The sludge volume index in the anaerobic reactor was about 12 after granulation occurred.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700