Determine the estimated average probability of a dynamic system cascading collapse.
Taking the effect of hidden failure on a protection system.
To determine severe loading condition contributing to higher risk of system cascading collapse.
Determine transmission line tripping contributing to higher risk of system cascading collapse.
This information of risk assessment is important to the utility.