The value of narrow band imaging endoscope for early head and neck cancers
详细信息    查看全文
文摘
In the manufacturing practice, cycle time is usually optimized in order to plan the batch size, and production time among other parameters. In certain situations, the production rate is decreased in order to have lower inventory levels or to deal with a shelf life constraint. This technical note examines the increase/decrease in the demand level along with a discussion concerning flexibility of the production rate. A generalized problem is also formulated in the context of the costs that are incurred in order to maintain certain demand level.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700