Co-scheduling of lock and water-land transshipment for ships passing the dam
详细信息    查看全文
文摘
listitem" id="list_lis0005">

A co-scheduling model of lock and water–land transshipment mixed transport system is built.

Genetic operators based artificial bee colony is proposed to solve the co-scheduling model.

Width sorting fast dispatch and first-come-first-served strategy are used to solve lock schedule.

The proposed model is tested by co-scheduling system of Three Gorges dam.

Comparative studies show that the proposed method is effective for solving co-scheduling model.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700