IME–FO lab-scale tests and IME–FOC–biological treatment full-scale experiments were conducted.
Optimal parameters were obtained and the BOD5/COD of wastewater improved 2.8 times after pretreatment.
IME effluent with appropriate pH and high Fe2+ concentration was suitable for the FO process.
The combined system had a high pollutant removal efficiency and good operating stability.