A dynamic model of ash deposit formation was developed by DSMC method.
The deposit thickness of the inner layer is less than that of the outer layer.
The ash deposit thickness increases by 47.52% with the load increases by 20%.
Results are consistent with the morphology of ash deposit determined by SEM/EDS.