The paper proposes a cooperative scheme for planning drayage operations.
The profit of the coalition is maximized ensuring a benefit for each carrier.
A novel compensation mechanism considers the importance of a trip for its carrier.
Node time windows and trip deadlines are considered in combining the trips.