Earth Pressure and Settlement Analysis of Trench Ducts Backfilled with Controlled Low Strength Materials
详细信息    查看全文
文摘
Recently trench ducts for allocating conveying pipes for various hydraulic or electric lines are tremendously constructed due to rapid growth of life and communication demand. Graded sands and concrete are usually in conventional excavation and backfill operation. Controlled low-strength material (CLSM) has been proposed as a suitable substitute for this construction. However, exact and reliable analysis is required to assure the stress and settlement limitation. This paper presents static analysis of trench duct backfilled with sustainable materials and conventional materials using boundary element (BE) method. The Young's moduli of CLSM are obtained from laboratory tests for two different binder mixtures, CLSM B-130/30% and CLSM B-8-/30%, respectively. Two-dimensional planar strain is employed in the BE formulation of static analysis and comparison study of 4 kinds of backfill materials, i.e., graded sand, CLSM B130-30%, CLSM B130-80%, and concrete. Emphasis is put on the lateral pressure on the side wall, settlement at the top of trench duct, vertical displacement along the centerline of duct and top of pipe cover, induced by three wheel surcharges: concentrated, strip and uniform lane loads. Convergence tests of BEM results are first conducted. Numerical results show that the settlement and lateral pressure of CLSM backfills are acceptable to assure the applicability of CLSM as a suitable sustainable material employed for trench duct design and backfill construction.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700