Coordinated control of a hydraulic forestry crane and a vehicle platform is proposed. The vehicle follows a given path and the crane a time based trajectory. Path and trajectory tracking is based on nonlinear model predictive control. Average tracking error of the vehicle was 6.7–36.2 cm and boom tip 3.7–13.6 cm.