An object oriented model is used to recreate electrical and instrumentation drawings undertaken in CAD.
A constructability assessment of the CAD drawings is undertaken
A number of errors, omissions and information redundancy are identified
A SIM was developed to examine the tender proposal of a subcontractor
The use of a SIM during construction can ensure the ‘as-built’ documentation that is produced are accurate and reliable