Methodical approach to increase productivity and reduce lead time in assembly and production-logistic processes
详细信息    查看全文
文摘
The introduced methodical approach connects Value Stream Mapping (VSM) and Methods-Time Measurement (MTM) and offers new distinct advantages to reduce lead time and increase productivity based on lean principles and standardised processes. The mutually aligned design and improvement of assembly and (production) logistic processes takes either the workplaces, their surroundings and the supply areas as well as the overall value chain into account. The identification and exploitation of productivity potentials is realised by the joint application of VSM and MTM focussing the (work) methods, the performance and the utilisation of the processes (the dimensions of productivity).

Principles, benefits and the procedure of application are described in the paper. A practical example highlights the redesign of assembly workplaces and the redesign of (production) logistic processes to reduce inventory/lead time using logistical and ergonomic aspects specially applying MTM logistic process elements.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700