Transient stability study of a large and real EHV system with several interconnections and realistic load-flow dispatch.
Use of an accurate dynamic model including models of all components such as governors, excitation systems, loads, and etc. (see Appendix A).
Determination of influence of long EHV cables switching on the transient stability of a realistic grid.
An investigation of the influence of different shunt reactor arrangements on the system dynamic behaviour.
An implementation of a novel flexible switching sequence methodology, which leads to the overvoltage amplitude decrease up to 10%.