Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost
详细信息    查看全文
文摘
To maintain a multi-stage cleaner production process, the major task is eliminating all defective items during the production system and an investment is necessary to reduce the probability of in-control state to out-of-control state of machinery system. In this direction, a logarithmic expression suggested by Porteus (1986) to consider in a single-stage imperfect manufacturing process for quality improvement, whereas this paper enables to consider the similar investment in a complex multi-stage imperfect manufacturing process to clean the production system. Using it, this paper develops a joint replenishment problem for complex multi-stage quality improvement. The study investigates a stochastic inventory model with a budget constraint for simultaneously optimizing number of shipments, replenishment interval, safety factor, backorder discounts, quality factor, and lead time as decision variables. Lead time is assumed as stochastic in nature, where a lead time crashing cost is used to reduce the lead time. As lead time is stochastic, a backorder price discount is allowed to save lost sells. To solve this problem, an improved algorithm is developed and two theorems are proved to obtain global optimal solution for this model analytically. Finally, some numerical examples and graphical illustrations are given to illustrate this model.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700