A district heating prosumer case study on Malmö, Sweden is executed.
There is great potential for prosumer contribution in district heating networks.
Especially buildings with a continuous cooling demand have prosumer potential.
Prosumer heat power output often coincides with a low heat demand during summer.
A lot of prosumers require electricity, which affects the environmental results.