Test of ITER conductors in SULTAN: An update
详细信息    查看全文
文摘
The ITER Toroidal Field (TF) conductor qualification phase has been carried out by testing short sample prototype conductors in the SULTAN test facility. This phase, started in 2007, has been substantially completed after minor adjustment of the conductor specification and test procedures. All the parties involved in the TF conductor procurement passed the qualification phase. Starting 2010, the samples for TF process qualification phase are tested in SULTAN. A summary of the results for all the ITER Qualification samples and an updated statistics are presented for the V?i xmlns="""">I and V?i xmlns="""">T characteristics of the cable-in-conduit conductors (CICC), including Nb3Sn and NbTi samples assembled with either a ¡°bottom joint?or a ¡°U-bend?

The technical improvements of the test facility are reported, including the enhanced cyclic loading rate and the calibration of the current meter. An outlook of the ITER conductor tests in the coming years is also presented.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700