Design of sequential excavation method for large span urban tunnels in soft ground - Niayesh tunnel
详细信息    查看全文
文摘
Modern tunnel design and construction requires appropriate techniques and technologies during all phases of a tunnel project. Selecting a suitable excavation procedure for large span urban tunnel projects in soft ground is a key factor for successful construction of the project. The costs and time for tunnel construction are strongly influenced by the choice of the excavation procedure. This research focuses on the selection of excavation method, excavation sequence and optimum trailing distance between different excavation stages in soft ground urban tunnelling. Considering soft ground condition and the big cross section of the Niayesh urban road tunnel project, sequential excavation method (SEM) was selected for tunnel construction. In this phase, Central Diaphragm (CD) and Side wall Drift (SD) methods were proposed for tunnel construction and appropriate method was selected based on its potential to limit surface settlements. Then, different excavation sequences considering side wall drift method were planned and modelled using three dimensional finite element method and optimal excavation sequence was selected. Finally, the trailing distance between different excavation stages were analysed numerically and the optimal distance with minimum surface settlement was determined.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700