A pilot plant was designed for the treatment of small E-waste via hydrometallurgy.
Life Cycle Assessment was performed to analyse the associated environmental impacts.
Nitric acid leaching contributes mostly to the impacts (from 40% to 80%).
Environmental performances could be improved by optimizing the adsorption step.