Minimum cost solar power systems for LTE macro base stations
详细信息    查看全文
文摘
This paper proposes an algorithm for the identification of the minimum cost solution over a 10 year time horizon to power an LTE (Long-Term Evolution) macro base station, using a photovoltaic solar panel, a set of batteries, and optionally also a secondary power source, which can be a connection to a (possibly unreliable) power grid, or a small Diesel generator. The optimization is formalised as an Mixed Integer Programming (MIP) problem, which, after linearization, can be solved with CPLEX. A heuristic algorithm is also proposed, with the objective of decreasing the computational complexity of the optimization. Numerical results show that a hybrid solar-grid (or solar-diesel) power system saves a significant fraction of the total cost, compared to a pure solar system, and to the traditional power-grid system, over the investigated 10-year period, in a south European city, like Torino in Italy, as well as in a location close to the tropic, like Aswan in Egypt. Our proposed heuristic algorithm can be used to obtain a solution within 10–20% of the optimum, at a computational speed 200 times faster than the MIP solution.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700