We solve a multi-item, two-echelon service part optimization problem.
We show the added value of our model for a utility company.
We solve a new two-echelon inventory model with lot sizes >1 at the central depot.
We simplify inventory decisions based on a statistical analysis of model output.
We show the cost of simplification.