Integrated Constraint Programming Scheduling Approach for Automated Wet-Etch Stations in Semiconductor Manufacturing
详细信息    查看全文
  • 作者:Luis J. Zeballos ; Pedro M. Castro ; Carlos A. Me虂ndez
  • 刊名:Industrial & Engineering Chemistry Research
  • 出版年:2011
  • 出版时间:February 2, 2011
  • 年:2011
  • 卷:50
  • 期:3
  • 页码:1705-1715
  • 全文大小:282K
  • 年卷期:v.50,no.3(February 2, 2011)
  • ISSN:1520-5045
文摘
This article addresses a challenging resource constrained flow shop scheduling problem from automated wet-etch stations (AWSs) in wafer fabrication of semiconductor manufacturing facilities by means of a constraint programming (CP) methodology. Wet etching in wafer fabrication is a difficult process considering the material handling limitations and mixed intermediate policies. The proposed integrated approach consists of both a CP model and an efficient search strategy in order to handle the different features of the process. The domain-specific search strategy significantly improves the computational performance, a key aspect given the high combinatorial complexity of the problem. The search strategy objective is to avoid losing time due to early bad choices in the exploration and to produce good quality solutions with low computational effort. The applicability of the proposed integrated CP methodology is successfully tested with several examples taken from the literature, featuring a different number of jobs and baths.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700