Multiperiod Stochastic Optimization Model for Carbon Capture and Storage Infrastructure under Uncertainty in CO2 Emissions, Product Prices, and Operating Costs
详细信息    查看全文
  • 作者:Jee-Hoon Han ; In-Beum Lee
  • 刊名:Industrial & Engineering Chemistry Research
  • 出版年:2012
  • 出版时间:September 5, 2012
  • 年:2012
  • 卷:51
  • 期:35
  • 页码:11445-11457
  • 全文大小:476K
  • 年卷期:v.51,no.35(September 5, 2012)
  • ISSN:1520-5045
文摘
A multiperiod stochastic programming model is developed for planning a carbon capture and storage (CCS) infrastructure including CO2 utilization and disposal in an uncertain environment and with a time-varying investment environment. An inexact two-stage stochastic programming approach is used to analyze the effect of possible uncertainties in product prices, operating costs, and CO2 emissions. The proposed model determines where and how much CO2 to capture, store, transport, utilize, or sequester for the purpose of maximizing the total profit of handling the uncertainty while meeting the CO2 mitigation target during each time period of a given planning interval. The capability of the proposed model to provide correct decisions despite a changing uncertain environment is tested by applying it to designing and operating the future CCS infrastructure on the eastern coast of Korea over a 20-year planning interval (2011鈥?030).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700