Impact of Workload and Renewable Prediction on the Value of Geographical Workload Management
详细信息    查看全文
  • 作者:Zahra Abbasi (19)
    Madhurima Pore (19)
    Sandeep K. S. Gupta (19)
  • 关键词:Cloud computing ; Data Centers ; Workload Prediction ; Renewable power ; electricity cost ; Energy Storage ; Energy Management
  • 刊名:Lecture Notes in Computer Science
  • 出版年:2014
  • 出版时间:2014
  • 年:2014
  • 卷:8343
  • 期:1
  • 页码:1-15
  • 参考文献:1. Clancy, H.: Facebook becomes renewable energy activist website, http://www.zdnet.com/blog/green/facebook-becomes-renewable-energy-activist/19656 (cited January 2013)
    2. greenpeace.org, Greenpeace activists project messages on apple headquarters from supporters asking for cleaner cloud (cited January 2013)
    3. Demasi, G.: More renewable energy for our data centers, http://googleblog.blogspot.com.ar/2012/09/more-renewable-energy-for-our-data.html (cited January 2013)
    4. Mcmillan, R.: Apple vows to build 100% renewable energy data center, http://www.wired.com/wiredenterprise/2012/04/applerenewable/ (cited January 2013)
    5. Rao, L., Liu, X., Xie, L., Liu, W.: Minimizing electricity cost: optimization of distributed Internet data centers in a multi-electricity-market environment. In: Proc. IEEE INFOCOM, pp. 1鈥? (2010)
    6. Abbasi, Z., Mukherjee, T., Varsamopoulos, G., Gupta, S.K.S.: DAHM: A green and dynamic web application hosting manager across geographically distributed data centers. ACM Journal on Emerging Technology (JETC)聽8(4), 34:1鈥?4:22 (2012)
    7. Le, K., Bilgir, O., Bianchini, R., Martonosi, M., Nguyen, T.D.: Managing the cost, energy consumption, and carbon footprint of internet services. In: Proc. of ACM SIGMETRICS, pp. 357鈥?58 (2010)
    8. Liu, Z., Lin, M., Wierman, A., Low, S.H., Andrew, L.L.H.: Greening geographical load balancing. In: Proc. ACM SIGMETRICS, San Jose, USA, June
    9. Zhang, Y., Wang, Y., Wang, X.: Greenware: Greening cloud-scale data centers to maximize the use of renewable energy. In: Kon, F., Kermarrec, A.-M. (eds.) Middleware 2011. LNCS, vol.聽7049, pp. 143鈥?64. Springer, Heidelberg (2011) CrossRef
    10. Liu, Z., Lin, M., Wierman, A., Low, S.H., Andrew, L.L.H.: Geographical load balancing with renewables. ACM SIGMETRICS Perf. Eval. Rev.聽39(3), 62鈥?6 (2011) CrossRef
    11. Qureshi, A., Weber, R., Balakrishnan, H., Guttag, J., Maggs, B.: Cutting the electric bill for Internet-scale systems. In: Proc. ACM SIGCOMM, pp. 123鈥?34 (2009)
    12. Buchbinder, N., Jain, N., Menache, I.: Online job-migration for reducing the electricity bill in the cloud. In: Domingo-Pascual, J., Manzoni, P., Palazzo, S., Pont, A., Scoglio, C. (eds.) NETWORKING 2011, Part I. LNCS, vol.聽6640, pp. 172鈥?85. Springer, Heidelberg (2011) CrossRef
    13. Lin, M., Liu, Z., Wierman, A., Andrew, L.L.H.: Online algorithms for geographical load balancing. In: Proc. of IEEE IGCC. IEEE (June 2012)
    14. Urgaonkar, R., Urgaonkar, B., Neely, M.J., Sivasubramanian, A.: Optimal power cost management using stored energy in data centers. In: Proc. of ACM SIGMETRICS, pp. 221鈥?32 (2011)
    15. Wang, D., Ren, C., Sivasubramaniam, A., Urgaonkar, B., Fathy, H.: Energy storage in datacenters: what, where, and how much? In: Proc. of the 12th ACM SIGMETRICS, pp. 187鈥?98 (2012)
    16. Kontorinis, V., Zhang, L.E., Aksanli, B., Sampson, J., Homayoun, H., Pettis, E., Tullsen, D.M., Rosing, T.S.: Managing distributed UPS energy for effective power capping in data centers. In: Proc. of the 39th IEEE ISCA, pp. 488鈥?99 (2012)
    17. Bar-Noy, A., Johnson, M.P., Liu, O.: Peak shaving through resource buffering. In: Bampis, E., Skutella, M. (eds.) WAOA 2008. LNCS, vol.聽5426, pp. 147鈥?59. Springer, Heidelberg (2009) CrossRef
    18. Liu, Z., Chen, Y., Bash, C., Wierman, A., Gmach, D., Wang, Z., Marwah, M., Hyser, C.: Renewable and cooling aware workload management for sustainable data centers. In: Proc. of the 12th ACM SIGMETRICS, pp. 175鈥?86 (2012)
    19. http://ita.ee.lbl.gov/html/traces.html
    20. NREL, Measurement and instrumentation data center MIDC, http://www.nrel.gov/midc/
    21. Jung, G., Hiltunen, M.A., Joshi, K.R., Schlichting, R.D., Pu, C.: Mistral: Dynamically managing power, performance, and adaptation cost in cloud infrastructures. In: Proc. of 30th IEEE International Distributed Computing Systems (ICDCS)
    22. Goiri, 脥., Beauchea, R., Le, K., Nguyen, T.D., Haque, M.E., Guitart, J., Torres, J., Bianchini, R.: GreenSlot: scheduling energy consumption in green datacenters. In: Proc. of 2011 International Conference for High Performance Computing, Networking, Storage and Analysis, pp. 20:1鈥?0:11 (2011)
    23. Sharma, N., Gummeson, J., Irwin, D., Shenoy, P.: Cloudy computing: Leveraging weather forecasts in energy harvesting sensor systems. In: Proc. of 7th Annual IEEE Conference on Sensor Mesh and Ad Hoc Communications and Networks (SECON), pp. 1鈥? (2010)
    24. Stewart, C., Shen, K.: Some joules are more precious than others: Managing renewable energy in the datacenter. In: Workshop on Power Aware Computing and Systems (2009)
    25. Akoush, S., Sohan, R., Rice, A., Moore, A.W., Hopper, A.: Free lunch: Exploiting renewable energy for computing. In: Proceedings of HotOS (2011)
  • 作者单位:Zahra Abbasi (19)
    Madhurima Pore (19)
    Sandeep K. S. Gupta (19)

    19. Impact Laboratory, School of Computing, Informatics and Decision Systems Engineering, Arizona State University, USA
  • ISSN:1611-3349
文摘
There has been increasing demand for energy sustainable and low-cost operation in cloud computing. This paper proposes dynamic Geographical Load Balancing and energy buffering management (GLB) to achieve these goals which (i) shifts workload (particularly peak workload demand) toward Data centers that offer low utility rate or green energy at a time, and (ii) banks excess green and low-cost energy to shift peak workload demand away from high utility rate. Such a scheme needs to be aware of the workload intensity and the available renewable power of the cloud in future (over a relatively long prediction window such as a day). Existing solutions mainly focus on developing algorithms and demonstrating the cost efficiency of GLB, disregarding the prediction accuracy of the workload and the renewable power. However, erroneous information decreases the efficiency of GLB. This paper studies the performance of the online GLB solution when using time-series based prediction techniques (e.g., ARIMA ) for the workload and the renewable power (i.e., solar and wind). The results of the simulation study using realistic traces highlight that GLB with and without prediction error is effective in reducing average energy cost and increasing sustainability of data centers. Further, GLB is shown to be significantly effective in shaving peak power draw from the grid (e.g., reducing peak power upto 100%), however the erroneous information due to the prediction error adversely affects its performance. Furthermore, the simulation study indicates that the optimal mix of the renewable power (i.e., wind and solar) to be leveraged by GLB, is achieved when data centers are powered from both the solar and the wind power.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700