参考文献:1.Lai, Y.C., Zeng, W.W., Liu, K.C., Wang, S.W.: Development of rolling stock assignment system for Taiwan high speed rail. In: Proceedings of 5th International Seminar on Railway Operations Modelling and Analysis, Copenhagen (2013) 2.Maroti, G., Kroon, L.F.: Maintenance routing for train units: the transition model. Transp. Sci. 39, 518–525 (2005)CrossRef MATH 3.Maroti, G., Kroon, L.: Maintenance routing for train units: the interchange model. Comput. Oper. Res. 34, 1121–1140 (2007)CrossRef MATH
16. Department of Industrial Management and Systems Engineering, Waseda University, 3-4-1 Ohkubo, Shinjuku, Tokyo, 169-8555, Japan
丛书名:Combinatorial Optimization
ISBN:978-3-319-45587-7
刊物类别:Computer Science
刊物主题:Artificial Intelligence and Robotics Computer Communication Networks Software Engineering Data Encryption Database Management Computation by Abstract Devices Algorithm Analysis and Problem Complexity
出版者:Springer Berlin / Heidelberg
ISSN:1611-3349
卷排序:9849
文摘
It is necessary for railway companies to construct daily schedules of assigning rolling stocks to utilization paths. A utilization path consists of a series of trains that a particular rolling stock performs in a day. A mixed integer programming model based on Lai et al. [1] is presented and is shown that straightforward applications of the model result in too much computational time and also inappropriate assignment schedules due to end effects. We show that the model can be modified to alleviate these difficulties, and also show that the repeated applications of the optimization model in the rolling horizon allow to generate a feasible assignment schedule for a longer period of time thus indicating the feasibility of the optimization approach.