The impacts of hydro-electric construction works on the hydrology of a subalpine area in Australia
详细信息    查看全文
文摘
 The Kiewa Hydro-Electric Scheme is a 184-MW hydro-electric facility in south-eastern Australia. Construction of the facility occurred predominantly between 1946 and 1961. Hydrological data spanning the 1925–1960 period is examined to determine the impact of construction works on streamflow, base-flow and quick-flow characteristics. A combination of non-parametric tests and descriptive hydrological analyses are used to examine three facets of construction activity. Reservoir construction that required the removal of vegetation and movement of earth material resulted in statistically significant changes in runoff. Likewise, power station construction activities that included movement of earth materials and construction of roads and power lines also resulted in statistically significant changes in runoff. However, subsurface tunnelling was accomplished independently of any changes in surface runoff. The increased runoff occurred in both subalpine and mountain catchments, which was particularly noticeable during storm events, and for one stream increased runoff was sustained for at least a decade.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700