参考文献:1. ATC-13 (1985) Earthquake damage evaluation data for California. Applied Technology Council 2. Chen CW (2004) Stability analysis of T-S fuzzy models for nonlinear multiple time-delay interconnected systems. Math Comput Simul 66:523鈥?37 CrossRef 3. Chen CW (2006) Stability conditions of fuzzy systems and its application to structural and mechanical systems. Adv Eng Softw 37:624鈥?29 CrossRef 4. Chen CW (2009) Modeling and control for nonlinear structural systems via a NN-based approach. Expert Syst Appl 36:4765鈥?772 CrossRef 5. Chen CW (2010a) GA-based adaptive neural network controllers for nonlinear systems. Int J Innov Comput Inf Cont 6:1793鈥?803 6. Chen CW (2010b) Stability analysis of an oceanic structure using the Lyapunov method. Eng Comput 27:186鈥?04 CrossRef 7. Chen CW (2010c) Application of fuzzy-model-based control to nonlinear structural systems with time delay: an LMI method. J Vib Control 16:1651鈥?672 CrossRef 8. Chen CY (2010d) Fuzzy control for an oceanic structure: a case study in time-delay TLP system. J Vib Control 16:147鈥?60 CrossRef 9. Chen CW (2011) Stability聽analysis and robustness design of nonlinear systems: an NN-based approach. Appl Soft Comput 11(2):2735鈥?742 CrossRef 10. Chen CW (2012a) A novel strategy to determine the insurance and risk control plan for natural disaster risk management. Nat Hazards. doi:10.1007/s11069-012-0305-3 11. Chen CY (2012b) Assessment of the major hazard potential of interfacial solitary waves moving over a trapezoidal obstacle on a horizontal plateau. Nat Hazards 62(3):841鈥?52 CrossRef 12. Chen CW (2012c) Hazard management and risk design by optimal statistical analysis. Nat Hazards. doi:10.1007/s11069-012-0329-8 13. Chen CW (2012d) A new viewpoint of hazard assessment and management for Taiwan鈥檚 insurance issues. Nat Hazards. doi:10.1007/s11069-012-0363-6 14. Chen CY (2012e) Disaster prevention and reduction for exploring teachers鈥?technology acceptance using a virtual reality system and partial least squares techniques. Nat Hazards 62(3):1217鈥?231 CrossRef 15. Chen CW, Tseng CP (2012) Default risk-based probabilistic decision model for risk management and control. Nat Hazards 63(2):659鈥?71 CrossRef 16. FEMA (1997) Earthquake loss estimation methodology: Hazus99. Technical Manual 3 17. Haque CE, Etkin D (2007) People and community as constituent parts of hazards: the significance of societal dimensions in hazards analysis. Nat Hazards 41(2):271鈥?82 CrossRef 18. Hsiao FH, Chen CW, Liang YW, Xu SD, Chiang WL (2005a) T-S fuzzy controllers for nonlinear interconnected systems with multiple time delays. IEEE Trans Circuits Systs-I Regul Pap 52:1883鈥?893 CrossRef 19. Hsiao FH, Hwang JD, Chen CW, Tsai ZR (2005b) Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control. IEEE Trans Fuzzy Syst 13:152鈥?63 CrossRef 20. Hsu WK (2000) The development of the integrated multi-objective seismic hazard assessment system, Doctoral Dissertation, National Central University 21. Hsu WK (2011) An integrated flood risk assessment model for property insurance industry in Taiwan. Nat Hazards 58(3):1295鈥?309 CrossRef 22. Hsu WK (2012) Risk and uncertainty analysis in the planning stages of a risk decision-making process. Nat Hazards 61(3):1355鈥?365 CrossRef 23. Huang TK (2008) Study of S-curve model for bridge construction projects. Master Thesis, National Kaohsiung First University 24. Lauras M, Marques G, Gourc D (2010) Towards a multi-dimensional project performance measurement system. Decis Support Syst 48:342鈥?53 CrossRef 25. Lin ML (2011) Using GIS-based spatial geocomputation from remotely sensed data for drought risk-sensitive assessment. Int J Innov Comput Inf Cont 7(2):657鈥?68 26. Lin JW (2012a) Kalman filter decision systems for debris flow hazard assessment. Nat Hazards 60(3):1255鈥?266 CrossRef 27. Lin JW (2012b) Modeling and assessment of bridge structure for seismic hazard prevention. Nat Hazards 61(3):1115鈥?126 CrossRef 28. Lin JW (2012c) Potential hazard analysis and risk assessment of debris flow by fuzzy modeling. Nat Hazards 64(1):273鈥?82 CrossRef 29. Lin CW (2012d) The construction of a high-resolution visual monitoring for hazard analysis. Nat Hazards. doi:10.1007/s11069-012-0409-9 30. Mike G (2007) Time to construct a better. Publication, JIT Re 31. Raaijmakers R, Krywkow J, van der Veen A (2008) Flood risk perceptions and spatial multi-criteria analysis: an exploratory research for hazard mitigation. Nat Hazards 46(3):307鈥?22 CrossRef 32. RMS (2007) Builder Risk Brochure 33. Shih BY (2012) Using Lego NXT to explore scientific literacy in disaster prevention and rescue systems. Nat Hazards. doi:10.1007/s11069-012-0233-2 34. Shinozuka M, Feng MQ, Lee J, Naganuma T (2000) Statistical analysis of fragility curves. J Eng Mech 126(12):1224鈥?231 CrossRef 35. The World Bank & Columbia University (2005) Natural diaster hotspots: a global risk analysis. Hazard Management Unit, The World Bank, Washington, DC 36. Tsai CH (2010) An earthquake disaster management mechanism based on risk assessment information for the tourism industry: a case study from the island of Taiwan. Tour Manage 31(4):470鈥?81 CrossRef 37. Tsai CH (2011a) Development of a mechanism for typhoon and flood risk assessment and disaster management in the hotel industry: a case study of the Hualien area. Scand J Hospital Tour 11(3):324鈥?41 CrossRef 38. Tsai CH (2011b) The establishment of a rapid natural disaster risk assessment model for the tourism industry. Tour Manage 32(1):158鈥?71 CrossRef 39. Tsai CH, Chen CW (2010) An earthquake disaster management mechanism based on risk assessment information for the tourism industry: a case study from the island of Taiwan. Tour Manage 31(4):470鈥?81 CrossRef 40. Tseng CP (2011) A new viewpoint on risk control decision models for natural disasters. Nat Hazards 59(3):1715鈥?733 CrossRef 41. Tseng CP (2012) Natural disaster management mechanisms for probabilistic earthquake loss. Nat Hazards 60(3):1055鈥?063 CrossRef 42. Tseng CP, Chen CW, Liu FR (2012) Risk control allocation model for pressure vessels and piping project. J Vib Control 18(3):385鈥?94 CrossRef 43. Yang HC (2012) Potential hazard analysis from the viewpoint of flow measurement in large open-channel junctions. Nat Hazards 61(2):803鈥?13 CrossRef 44. Zhou HJ, Wang JA, Wan JH et al (2010) Resilience to natural hazards: a geographic perspective. Nat Hazards 53(1):21鈥?1 CrossRef
2. Research Center for Hazard Mitigation and Prevention, National Central University, Jhung-li, Taoyuan, Taiwan, ROC 1. Department of Civil Engineering, National Central University, Jhung-li, Taoyuan, Taiwan, ROC 3. Civil and Hydraulic Engineering Research Center, Sinotech Engineering Consultants, Inc., Taipei, Taiwan 4. Institute of Maritime Information and Technology, National Kaohsiung Marine University, Kaohsiung, 80543, Taiwan 5. Department of Leisure Business Management, National Pingtung Institute of Commerce, Pingtung, Taiwan
ISSN:1573-0840
文摘
This paper presents the construction classification of the existing engineering covers in Taiwan. The exposure profile and variable vulnerability during different construction phases are established for some kinds of classes of construction. Finally, we present a method and framework to estimate the probable maximum loss of engineering insurance portfolio during an earthquake with consideration of the dynamic nature of structural changes and exposure values during a construction project.