A fuzzy grey goal programming approach for aggregate production planning
详细信息    查看全文
  • 作者:Mohammadreza Sadeghi (1)
    Seyed Hossein Razavi Hajiagha (2)
    Shide Sadat Hashemi (1)
  • 关键词:Aggregate production planning ; Goal programming ; Grey numbers ; Fuzzy numbers
  • 刊名:The International Journal of Advanced Manufacturing Technology
  • 出版年:2013
  • 出版时间:12 - February 2013
  • 年:2013
  • 卷:64
  • 期:9
  • 页码:1715-1727
  • 全文大小:272KB
  • 参考文献:1. Baykasoglu A, Gocken T (2006) A tabu search approach to fuzzy goal programs and an application to aggregate production planning. Eng Optim 38(2):155鈥?77 CrossRef
    2. Baykasoglu A, Gocken T (2010) Multi-objective aggregate production planning with fuzzy parameters. Adv Eng Software 41(9):155鈥?77 CrossRef
    3. Bouyssou D (1989) Modeling inaccurate determination, uncertainty, imprecision using multiple criteria. In: Locket AG, Islei G (eds) Improving decision making in organizations, lecture notes in economics and mathematical systems, 335. Springer, Berlin
    4. Can EK, Houck MH (1984) Real-time reservoir operations by goal programming. J Water Resour Plann Manag 110(3):297鈥?09 CrossRef
    5. Chen LH, Tsai FC (2001) Fuzzy goal programming with different importance and priorities. Eur J Oper Res 133(3):548鈥?56 CrossRef
    6. Deng JL (1982) Control problems of grey system. Syst Contr Lett 1(5):288鈥?94 CrossRef
    7. Deng JL (1989) Introduction to grey system theory. J Grey Theor 1:1鈥?4
    8. Gen M, Tsujimura Y, Ida K (1992) Method for solving multi objective aggregate production planning problem with fuzzy parameters. Comput Ind Eng 23(1鈥?):117鈥?20 CrossRef
    9. Hannan EL (1981) On fuzzy goal programming. Decis Sci 12(3):522鈥?31 CrossRef
    10. Hannan EL (1981) Some further comments on fuzzy priorities. Decis Sci 12(3):539鈥?41 CrossRef
    11. Hintz GW, Zimmermann HJ (1989) A method to control flexible manufacturing systems. Eur J Oper Res 41(3):321鈥?34 CrossRef
    12. Huang GH (1994) Grey mathematical programming and its application to municipal/solid waste management planning. Ph.D. Dissertation, Department of Civil Engineering, McMaster University.
    13. Ignizio JP (1976) Goal programming and extension. Heath Lexington Books, London
    14. Inuiguchi M, Kume Y (1991) Goal programming problems with interval coefficients and target intervals. Eur J Oper Res 52(3):345鈥?60 CrossRef
    15. Jamalnia A, Soukhakian MA (2009) A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning. Comput Ind Eng 56(4):1474鈥?486 CrossRef
    16. Krajewski LJ, Ritzman LP (1999) Operations management: strategy and analysis. Addison-Wesley, Singapore
    17. Kvanli AH (1980) Financial planning using goal programming. Omega 8(2):207鈥?18 CrossRef
    18. Lee YY (1990) Fuzzy set theory approach to aggregate production planning and inventory control. Ph.D. dissertation, Department of I.E., Kansas State University.
    19. Lin Y, Chen MY, Liu S (2004) Theory of grey systems: capturing uncertainties of grey information. Kybernetes 33(2):196鈥?18 CrossRef
    20. Liu S, Lin Y (2010) Grey systems: theory and applications. Springer, Berlin
    21. Liu S, Lin Y (2006) Grey information: theory and practical applications. Springer, London
    22. Michalewicz Z, Nazhiath G (1995) Genocop III: a co-evolutionary algorithms for numerical optimization problems with nonlinear constraints. In IEEE Proceedings of Second International Conference on Evolutionary Computation, Perth, Australia (pp. 647鈥?51).
    23. Narasimhan R (1980) Goal programming in a fuzzy environment. Decis Sci 11(2):325鈥?36 CrossRef
    24. Ning Y, Tang W, Zhao R (2006) Multiproduct aggregate production planning in fuzzy random environments. World J Model Simulat 2(5):312鈥?21
    25. Riabacke A (2006) Managerial decision making under risk and uncertainty. IAENG Int J Comput Sci 32(4):453鈥?59
    26. Rockafellar RT, Wets RJ-B (1991) Scenarios and policy aggregation in optimization under uncertainty. Math Oper Res 16(1):119鈥?47 CrossRef
    27. Romero C (1984) A note: effects of five-side penalty functions in goal programming. Omega 12(4):333鈥?33 CrossRef
    28. Saad GH (1982) An overview of production planning model: structure classification and empirical assessment. Int J Prod Res 20(1):105鈥?14 CrossRef
    29. Tiwari RN, Dharmar S, Rao JR (1986) Priority structure in fuzzy goal programming. Fuzzy Set Syst 19(3):251鈥?59 CrossRef
    30. Torabi SA, Ebadian M, Tanha R (2009) Fuzzy hierarchical production planning (with a case study). Fuzzy Set Syst 161(11):1511鈥?529 CrossRef
    31. Wang RC, Fang HH (2001) Aggregate production planning with multiple objectives in a fuzzy environment. Eur J Oper Res 133(3):521鈥?36 CrossRef
    32. Wang RC, Liang TF (2004) Application of fuzzy multi-objective linear programming to aggregate production planning. Comput Ind Eng 46(1):17鈥?1 CrossRef
    33. Wang RC, Liang TF (2005) Aggregate production planning with multiple fuzzy goals. Int J Adv Manuf Technol 25(5鈥?):589鈥?97 CrossRef
    34. Wang RC, Liang TF (2005) Applying possibilistic linear programming to aggregate production planning. Int J Prod Econ 98(3):328鈥?41 CrossRef
    35. Yang T, Ignizio JP, Kim H-J (1991) Fuzzy programming with nonlinear membership functions: piecewise linear approximation. Fuzzy Set Syst 41(1):39鈥?3 CrossRef
    36. Zeleny M (1981) The pros and cons of goal programming. Comput Oper Res 8:357鈥?59 CrossRef
    37. Zimmermann HJ (1978) Fuzzy programming and linear programming with several objective functions. Fuzzy Set Syst 1(1):45鈥?5 CrossRef
    38. Zimmermann HJ (1983) Fuzzy mathematical programming. Fuzzy Set Syst 10(4):291鈥?98
    39. Zimmermann HJ (1997) Fuzzy linear programming. In: Gal T, Greenberg HJ (eds) Advances in sensitivity analysis and parametric programming. Kluwer, Boston, pp 15.1鈥?5.40
  • 作者单位:Mohammadreza Sadeghi (1)
    Seyed Hossein Razavi Hajiagha (2)
    Shide Sadat Hashemi (1)

    1. Industrial Management Group, Faculty of Management and Accounting, Allameh Tabatabaei University, Tehran, Iran
    2. Productivity and Systematic Research and Studies Group, Institute for Trade Studies and Research, Tehran, Iran
  • ISSN:1433-3015
文摘
Aggregate planning is a medium-range capacity planning that suggests the production strategies in order to meet the forecasted demand considering the capacity constraints. As the period of planning length increases, the uncertainty of information will grow. Regarding this point, in this paper, a multi-objective model is proposed for aggregate planning problem in which the parameters of the model are expressed in the form of grey numbers. The suggested grey multi-objective model is solved based on a goal programming problem with fuzzy aspiration levels. The model is applied in a real-world problem, and its results are illustrated. The obtained results give a range for decision variables, and decision makers can handle the inevitable uncertainty of information by using these ranges.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700